This fully galvanized structure which is approx 40 ft tall was assembled at S2 Metal Fabricators. The structure was then split into two sections and then sent to the Adams Creek Power Generation Dam. See the video section of this site for a time-lapse view of the assembly.

HOME      ABOUT      CAPABILITIES      PROJECTS      FABRICATION      CONTACT

©  S2 Metal Fabricators Ltd. ALL RIGHTS RESERVED